north slocan trails society

Butter Me (not quite) Up

Butter Me Up is not yet finished and open to ride, but it’s getting close. Please hold off for the next two weeks so it is safe and packed and finished – any riding now could damage the soggy trail surface before it is finished and you really don’t want to bump into a machine on the trail!

But it’s getting so close! Last week Highland Creek Contracting working down from the top and Garett Buehler working up from the bottom met in the middle!

Butter Me Up will serve as an up-track to the incredibly popular Upper and Lower Butter trails, eliminating the need to climb the nasty old exposed logging roads. It has also been designed as a wide flowy downhill route for adaptive MTBers, so it will be a two-way trail.


Posted

in

by

Tags: